Live · 47 active sites across 18 countries
Investor relations · FY25 Q2 trading update·EN ·DE · FR · NL · IT · ES · PL · SV·EURONEXT: HXTL  €84.20 ▴ 1.42%
FY 2025 — Annual ReportGroup HQ · Rotterdam, NLFounded 1894

We build the
quiet infrastructure
Europe runs on.

Bridges, ports, rail corridors, hospitals, water networks and the renewable backbone of a continent in transition. Hextal is a Fortune 500 European group of 41,800 engineers, planners and craftspeople — building structures that outlast the people who commissioned them.
€18.4B
Group revenue · FY24
41,800
Employees · 32 nationalities
2,140
Active projects
131YR
In continuous operation
CRANE VESSEL · HEAVY-LIFT 14,200 tCAISSON CLUSTER B · 24 UNITS15 MW TURBINES (×280)
01 / FEATURED · DELIVERED 2025
Nordsee Energy Atoll — Cluster BA 4.2 GW offshore wind support platform, 64 km off the Dutch coast.
54.211° N
3.918° E
— — —
FRAME 01/06
FY25 H1 ORDER BOOK €32.6 B/NEW MANDATE · BERLIN HBF EXPANSION €1.4 B/SAFETY · 412 DAYS LTI-FREE · LISBON METRO /SBTi NET-ZERO TARGETS VALIDATED · 2024 /GROUNDBREAKING · ALPINE RAIL TUNNEL T-3 /EURONEXT HXTL €84.20 ▲/RECYCLED CONCRETE BLEND CB-7 CERTIFIED EN 206 /FY25 H1 ORDER BOOK €32.6 B/NEW MANDATE · BERLIN HBF EXPANSION €1.4 B/SAFETY · 412 DAYS LTI-FREE · LISBON METRO /SBTi NET-ZERO TARGETS VALIDATED · 2024 /GROUNDBREAKING · ALPINE RAIL TUNNEL T-3 /EURONEXT HXTL €84.20 ▲/RECYCLED CONCRETE BLEND CB-7 CERTIFIED EN 206 /

§ 01 — At a glance

Hextal began in 1894 with a single quay wall in the port of Rotterdam. One hundred and thirty-one years later, our people are still in the same harbour — and in the alpine tunnels of Tyrol, the high-speed corridors of Iberia, the hospitals of Warsaw, and on the seabed of the North Sea.
ListedEuronext Amsterdam
IndexAEX · STOXX Europe 600
RatingA− stable (S&P)
AuditorMazars Europe
ReportingIFRS · CSRD compliant

Twelve projects, one continent.

Brenner Base — North Approach, Tube T-3Delivered · 202547.267°N
11.392°E
P-2018-094 · Tyrol, AustriaInfrastructure / Tunnel

Brenner Base — North Approach, Tube T-3

22.4 km twin-bore alpine tunnel beneath the Stubai range. Hextal led the TBM consortium and the cross-passage civils. Excavated material reused as aggregate within a 40 km radius — net-positive on embedded carbon vs. EN 16627 baseline.

TBM Ø 10.7 mConcrete C50/60Embedded CO₂ −18%
Project dossier
Berlin Hauptbahnhof — Southern ConcourseIn progress · 78%52.524°N
13.369°E
P-2022-141 · Berlin, DECivic / Rail

Berlin Hauptbahnhof — Southern Concourse

14,800 m² extension, glass-and-steel canopy spanning four ICE platforms. Built without interrupting service.

€1.4 BLive ops
Project dossier
Maasvlakte III — Caisson Dry DockMarine51.916°N
4.487°E
P-2019-007 · RotterdamMarine / Port

Maasvlakte III — Caisson Dry Dock

A 1.2 km automated container quay built on a man-made polder.

2.1 M m³ fill
Project dossier
Hospital de Sant Pau — Pavilion 04Heritage41.404°N
2.174°E
P-2021-203 · BarcelonaHeritage / Restoration

Hospital de Sant Pau — Pavilion 04

Modernist masonry stabilisation across nine pavilions. UNESCO listed since 1997.

UNESCO1902 fabric
Project dossier
ROTBERLISVIELDNLive map47 sites
Group operationsEurope + N. Africa

Where we are, right now

A real-time view of every active site, crew rotation and load-in window.

Updated 04:02 CET
Open map
Embedded CO₂ — tonnes / €M revenue
2007 → 2025   ▼ 61%
Sustainability
Group decarbonisation programmeSBTi · CSRD · EU Taxonomy

From a heavy industry to a measured one.

We track every tonne of CO₂e against every euro of revenue, in every contract, every quarter, since 2007. The full ledger is open to our shareholders, our regulators and our future.

Scope 1 + 2 + 3Audited by MazarsOpen ledger
Climate report 2025
Sognefjord Pumped StorageEnergy60.391°N
5.322°E
P-2023-018 · Bergen, NOEnergy / Hydro

Sognefjord Pumped Storage

2.6 GW reversible hydro plant carved into Norwegian gneiss — a battery the size of a fjord.

2.6 GWLive · 2027
Project dossier

Five disciplines, one delivery model.

Full capability matrix

See how we build.

From factory floor to open sea, our teams deliver precision engineering across every discipline. These are not renders — this is work in progress.

01 / MODULAR CONSTRUCTION

Precision at scale

Off-site fabrication of structural modules reduces on-site labour by 40% and cuts programme duration by up to six months. Every module is digitally twinned before it leaves the factory floor.

02 / MATERIALS INNOVATION

The next generation of concrete

Our proprietary CB-7 blend uses 72% recycled aggregate and achieves C50/60 compressive strength with 18% lower embedded carbon than EN 16627 baseline. Certified across 14 European jurisdictions.

03 / STEEL & HEAVY LIFT

Engineering without compromise

From deep-water jacket foundations to 14,200-tonne crane vessel lifts, our steel fabrication and marine installation teams deliver the structures that hold Europe's energy transition together.

§ 04 — Group, in numbers

The hard figures from FY24 — audited, IFRS-prepared, and reconcilable to every press release we've issued since the day we listed in 1968.
€18.4B
Group revenue
▲ 7.2% YoY · constant FX
€32.6B
Order book · H1 25
▲ 11.4% vs FY24
9.1%
Adjusted EBIT margin
▲ 60 bps
−61%
Embedded CO₂ / €M rev. since 2007
on track for −75% by 2030
0.41
LTI rate / 200k hrs
vs sector mean 1.9

The current quarter, unedited.

Pressroom