Live · 47 active sites across 18 countries
Investor relations · FY25 Q2 trading update·EN ·DE · FR · NL · IT · ES · PL · SV·EURONEXT: HXTL  €84.20 ▴ 1.42%

2,140 active projects across 18 countries.

From alpine base tunnels to offshore energy platforms, the Hextal portfolio represents 131 years of continuous civil engineering across the European continent.

EUR 84B
Total backlog
2,140
Active projects
4,200+
Delivered
131yrs
Continuous operations
6results · Grid view
Delivered · 202547.267°N
11.392°E
P-2018-094 · Tyrol, AustriaInfrastructure

Brenner Base — North Approach, Tube T-3

22.4 km twin-bore alpine tunnel beneath the Stubai range. Hextal led the TBM consortium and the cross-passage civils. Excavated material reused as aggregate within a 40 km radius — net-positive on embedded carbon vs. EN 16627 baseline.

TBM Ø 10.7 mConcrete C50/60Embedded CO₂ −18%
Project dossier
In progress · 78%52.524°N
13.369°E
P-2022-141 · Berlin, DECivic

Berlin Hauptbahnhof — Southern Concourse

14,800 m² extension, glass-and-steel canopy spanning four ICE platforms. Built without interrupting service.

€1.4 BLive ops
Project dossier
Marine51.916°N
4.487°E
P-2019-007 · RotterdamMarine

Maasvlakte III — Caisson Dry Dock

A 1.2 km automated container quay built on a man-made polder.

2.1 M m³ fill
Project dossier
Heritage41.404°N
2.174°E
P-2021-203 · BarcelonaHeritage

Hospital de Sant Pau — Pavilion 04

Modernist masonry stabilisation across nine pavilions. UNESCO listed since 1997.

UNESCO1902 fabric
Project dossier
Energy60.391°N
5.322°E
P-2023-018 · Bergen, NOEnergy

Sognefjord Pumped Storage

2.6 GW reversible hydro plant carved into Norwegian gneiss — a battery the size of a fjord.

2.6 GWLive · 2027
Project dossier
Delivered · 202554.211°N
3.918°E
P-2020-042 · North Sea, NLEnergy

Nordsee Energy Atoll — Cluster B

A 4.2 GW offshore wind support platform, 64 km off the Dutch coast. 280 × 15 MW turbines on gravity-base foundations.

4.2 GW280 turbinesGravity-base
Project dossier
§ 04 - By the numbers
The scale of work that defines a generation of infrastructure.
EUR 4.2B
Largest single contract
Nordsee Energy Atoll, Cluster B
22.4km
Longest tunnel
Brenner Base, North Approach T-3
4.2GW
Offshore wind capacity
Installed and commissioned
280
Turbines installed
15 MW gravity-base foundations
P-2020-042 · Energy / Offshore Wind

Nordsee Energy Atoll
Cluster B

A 4.2 GW offshore wind support platform, 64 km off the Dutch coast. 280 × 15 MW turbines on gravity-base foundations.

Specifications
Contract value€4.2B
Capacity4.2 GW / 280 turbines
Duration5.5 years (2020 - 2025)
StatusDelivered
ContractorHextal Group / Van Oord JV
LocationNorth Sea, 64 km off Dutch coast
Foundation typeGravity-base, 15 MW per unit

Where the work happens.

Benelux

412 projects

Home market since 1894. Port infrastructure, flood defence and the densest motorway network in Europe.

View region

DACH

387 projects

Alpine tunnelling, rail corridors and urban transit systems across Germany, Austria and Switzerland.

View region

Nordics and Iberia

524 projects

Offshore energy in Scandinavia, high-speed rail and heritage restoration across the Iberian peninsula.

View region

UK and Ireland

318 projects

Marine engineering, rail electrification and civic buildings across both islands.

View region